  • Installation and Commissioning of Critical Emergency Energy System at the National Institute of Pharmaceutical Research, Abuja.
  • Supply and Installation of Tripping Systems to RCC Nigeria Limited for the operation and maintenance of Medium Voltage Equipment at the Federal Ministry of Finance Complex, Abuja.
  • Comprehensive servicing and maintenance of CBN Headquarters Complex, Abuja Medium Voltage Distribution Network, including the re-calibration and setting of associated protection relays for ETCO Nigeria Limited.
  • Supply, Installation and Commissioning of Medium Voltage Distribution Network at Dantata Shopping Complex, Utako, Abuja.
  • Laying and Termination of 33KV XLPE cable between PHCN 132/33KV GIS Sub-Station, Central District, Abuja and the High Court Building.
  • Replacement and repair of 11KV Switchgear at CBN Headquarters for ETCO Nigeria Limited
  • Supply, Installation and Commissioning of 11KVA 5MVAR Outdoor Capacitor Bank for the Niger State Water Board, Minna
  • Supply of 600KVAR Fitter Panel Capacitor Bank for RCC Nigeria Limited Quarry, Ibadan, Oyo State.
  • Operation of NASS – Abuja Medium Voltage Network and Annual Comprehensive Servicing and Maintenance of its Medium Voltage Distribution Network for Julius Berger Nigeria Limited.
  • Installation and Commissioning of 33KV overhead transmission line, including step-down substation at Coscharis Shopping Center, Aja, Lagos.
  • Retrofitting of Federal Secretariat Complex Medium Voltage Power System, Abuja.
  • Construction of 33KV OHTL including an Outdoor Injection Sub-station(on behalf of Kinetic Investment Limited) for Coscharis Motors, Lekki, Lagos.
  • Installation and Commissioning of Critical Emergency Energy System at the National Institute of Pharmaceutical Research, Abuja.
  • Supply and Installation of Tripping Systems to RCC Nigeria Limited for the operation and maintenance of Medium Voltage Equipment at the Federal Ministry of Finance Complex, Abuja.
  • Comprehensive servicing and maintenance of CBN Headquarters Complex, Abuja Medium Voltage Distribution Network, including the re-calibration and setting of associated protection relays for ETCO Nigeria Limited.
  • Supply, Installation and Commissioning of Medium Voltage Distribution Network at Dantata Shopping Complex, Utako, Abuja.
  • Laying and Termination of 33KV XLPE cable between PHCN 132/33KV GIS Sub-Station, Central District, Abuja and the High Court Building.
  • Replacement and repair of 11KV Switchgear at CBN Headquarters for ETCO Nigeria Limited
  • Supply, Installation and Commissioning of 11KVA 5MVAR Outdoor Capacitor Bank for the Niger State Water Board, Minna
  • Supply of 600KVAR Fitter Panel Capacitor Bank for RCC Nigeria Limited Quarry, Ibadan, Oyo State.
  • Operation of NASS – Abuja Medium Voltage Network and Annual Comprehensive Servicing and Maintenance of its Medium Voltage Distribution Network for Julius Berger Nigeria Limited.
  • Installation and Commissioning of 33KV overhead transmission line, including step-down substation at Coscharis Shopping Center, Aja, Lagos.
  • Retrofitting of Federal Secretariat Complex Medium Voltage Power System, Abuja.
  • Construction of 33KV OHTL including an Outdoor Injection Sub-station(on behalf of Kinetic Investment Limited) for Coscharis Motors, Lekki, Lagos.